Project gallery
Docks, floats, seawalls and heavy marine work.
Every project here was built by Red Fish, from Casco Bay through the midcoast. Sort by type to browse the work.
-
Built 2025
1year onDocksTimber landing & gangwayHarpswell
A new subdivision dock.
-
Barge workOur crane barge
Our own work barge and crane, which sets pilings and heavy timbers from the water where a truck cannot reach.
-
Built 2016
10years onSeawallsTimber seawallHarpswell
A timber seawall built in 2016 to hold the bank along a Harpswell shore.
-
Built 2025
1year onFloatsRamp & float in a coveHarpswell
Another view of the same subdivision dock: the gangway down to its float.
-
Built 2026
0years onFloatsSwim & boat floatMere Point, Brunswick
A swim and boat float at Mere Point, reached by a gangway from the walkway across the ledge.
-
Built 2025
1year onPile drivingPile-driven pier foundationHarpswell
Under the pier that replaced one destroyed by a storm: marine-grade pilings and cross-bracing, built higher than before for future storms.
-
Built 2026
0years onDocksTimber walkway & landingMere Point, Brunswick
Part of the same Mere Point build: a timber walkway over the ledge, through an arbor to the shore stairs.
-
Built 2026
0years onFloatsGangway & float on ledgeMere Point, Brunswick
Part of the same Mere Point build: an aluminum gangway from the ledge down to the float.
-
Built 2026
0years onDocksSwitchback shore stairsMere Point, Brunswick
Part of the same Mere Point build: switchback stairs down the wooded bank to the water.
-
Built 2025
1year onDocksPier & ramp over the harborHarpswell
A replacement pier on piles, built after a storm destroyed the one before, with about 1,100 square feet of deck.
-
Built 2025
1year onPile drivingPiling pier to deep waterHarpswell
The same storm replacement pier from the water, with its aluminum stairs down to the tide.
-
Built 2025
1year onDocksNew timber pier & walkwayHarpswell
The walkway out to the same storm replacement pier, kept to the old dimensions but raised for future storms.
-
Built 1998
28years onDocksPier, float & harbour landingHarpswell
A pier, float and harbour landing in Harpswell, built in 1998.
-
Built 2024
2years onDocksWorking wharf & landingHarpswell
A working wharf with an aluminum ramp down to a float, built in 2024.
-
Built 2026
0years onDocksShore stairs & landingMere Point, Brunswick
Part of the same Mere Point build: the shore stairs and landing at the top of the bank.
See your shoreline in this gallery next.
Tell us about your waterfront and how you want to use it. We’ll walk the site and lay out your options.